Floor Stainless steel access door 120 cm x 140 cm for indoor and outdoor use
Images are for informational purposes only. Each product is unique and may differ from the image
Floor Stainless steel access door 120 cm x 140 cm for indoor and outdoor use
А ѕtаіnlеѕѕ ѕtееl flооr ассеѕѕ dооr ѕuіtаblе fоr оutdооr uѕе іѕ tурісаllу dеѕіgnеd tо wіthѕtаnd hаrѕh wеаthеr соndіtіоnѕ аnd рrоvіdе durаblе ассеѕѕ tо undеrgrоund utіlіtу vаultѕ оr оthеr соnfіnеd ѕрасеѕ. Іt'ѕ соnѕtruсtеd frоm hіgh-grаdе ѕtаіnlеѕѕ ѕtееl tо rеѕіѕt соrrоѕіоn, ruѕt, аnd dеtеrіоrаtіоn frоm ехроѕurе tо mоіѕturе, ѕunlіght, аnd tеmреrаturе fluсtuаtіоnѕ. Тhе dооr uѕuаllу fеаturеѕ а ѕесurе lосkіng mесhаnіѕm tо рrеvеnt unаuthоrіzеd ассеѕѕ аnd mау hаvе а wеаthеrрrооf ѕеаl tо kеер оut wаtеr аnd dеbrіѕ. Аddіtіоnаllу, іt mіght bе dеѕіgnеd tо ѕuрроrt hеаvу lоаdѕ аnd рrоvіdе а ѕаfе аnd ѕtаblе ѕurfасе fоr fооt trаffіс оr еquірmеnt.- Availability: Pre-Order 18 - 21 business days
- Model: LKN120140AISI
- Weight: 88.00kg
- Dimensions: 140.00cm x 120.00cm x 9.50cm
Available Options
Dimensions | |
Material | Stainless steel |
Mounting width | 120 cm |
Mounting height | 140 cm |
Full width | 127 cm |
Full height | 147 cm |
Door size (w x h) | 138cm x 114 cm |
Depth | 9,5cm |
1. General position
Floor hatches are designed for horizontal installation with a cover at the top.
Caution: Do not exploit the floor
hatch prior to laying flooring.
2. Installation
Work sequence:
2.1 markup
2.2 Carefully place the filled hatch in the prepared opening
2.3 adjust the level. The top edge of the filled hatch should be flush with the floor level.
2.4 secure the frame with anchors in the opening
2.5 measure the distance from the edge of the tile cuts 2-4 mm (depending on your inter-tile seam)the required distance between the tiles to the line of applying glue to the frame. From the inner edge of the strip of the frame it will be within 5-8 mm (and outline is the line of the edge of the floor, look at the scheme of laying tiles on the hatch).
2.6 the edge of the tile from the hinge side trim the rod 60 degrees, see the scheme of laying tiles on the hatch.This is necessary to prevent cracking of the tile at the time of opening.
2.7 At the passage of the hole for the T shaped screw handle,drill a tile, make a hole in the tile -0.12 mm
2.8 we paste the tile on the door surface (gypsum board) protecting the hole in the manhole cover from the edge and lifting it up.
2.9 stick tiles on the floor surface around the hatch.
3.Оpening
The hatch is opened using the T-shaped screw handle, screwing it in using the special hole in the hatch cover and lifting it.
Attention! It is recommended to make control openings of the hatch once every three months.
4.Closing.
Before closing, check that there are no foreign objects on the hatch frame and that the seal is correctly inserted.
4.1 release the cover by holding it by the screw door and the T-shaped handle
4.2 unscrew the screw handle from the hole
5. Instructions for the installation of fittings
When installing, attention must be paid to threaded connections. They must be securely locked. No play is allowed. With the roof open, the stem of the valve must be at the bottom (Avoid lateral loads on shock absorbers, do not expose shock absorbers especially to the stem to shock, pollution, or aggressive environment.