Floor steel access door size 80 cm x 220 cm "H"
Attention! Walking on the floor hatch is strictly recommended only after a complete installation with a coating!!!
- Availability: Pre-Order 18 - 21 business days
- Model: LKN80220
- Weight: 108.00kg
- Dimensions: 80.00cm x 220.00cm x 9.50cm
Available Options
Allowable load on the floor access door (hatch) up to 1000kg
"H" - HINGES SIDE
- FRAME MATERIAL - STEEL (powder painting)
- DOOR MATERIAL - PLASTERBOARD, OSB panel, PLYWOOD, METAL SHEET or PLEXIGLASS
- OPTIONS FOR USE - Dry room
- WATERPROOF - NO
The kit includes:
1. Floor hatch assembly
2. Key (for models wit gas struts)
3. Gas struts or linear actuator (motor) with remote control (depends from options you choose)
PECULIARITIES:
- Makes access to the basement easy and convenient
- Easy opening - a few turns of the key and the lid will rise by itself
- Provides warmth and absence of foreign odors in the room
- The hatch is covered with a polymer color "Antique silver
- Sealed
- Sealing on four sides
- Reinforced structure (manhole cover can withstand up to 1000 kg of load)
- You can choose a hatch for any size
- Affordable price with excellent quality
TERM OF USE:
The hatch is made of polymer coated steel.
This extends the service life for a long time.
YOU CAN USE FOR COATING:
- Tiles
- Linoleum
- Laminate
- Carpet
- Other floor coverings (no thicker than 20 mm)
- Wood planks
Dimensions | |
Mounting width | 80 cm |
Mounting height | 220 cm |
Full width | 87 cm |
Full height | 227 cm |
Door size (w x h) | 74cm x 218 cm |
Depth | 9,5cm |
Weight | 73 kg |
1. General position
Floor hatches are designed for horizontal installation with a cover at the top.
Caution: Do not exploit the floor
hatch prior to laying flooring.
2. Installation
Work sequence:
2.1 markup
2.2 Carefully place the filled hatch in the prepared opening
2.3 adjust the level. The top edge of the filled hatch should be flush with the floor level.
2.4 secure the frame with anchors in the opening
2.5 measure the distance from the edge of the tile cuts 2-4 mm (depending on your inter-tile seam)the required distance between the tiles to the line of applying glue to the frame. From the inner edge of the strip of the frame it will be within 5-8 mm (and outline is the line of the edge of the floor, look at the scheme of laying tiles on the hatch).
2.6 the edge of the tile from the hinge side trim the rod 60 degrees, see the scheme of laying tiles on the hatch.This is necessary to prevent cracking of the tile at the time of opening.
2.7 At the passage of the hole for the T shaped screw handle,drill a tile, make a hole in the tile -0.12 mm
2.8 we paste the tile on the door surface (gypsum board) protecting the hole in the manhole cover from the edge and lifting it up.
2.9 stick tiles on the floor surface around the hatch.
3.Оpening
The hatch is opened using the T-shaped screw handle, screwing it in using the special hole in the hatch cover and lifting it.
Attention! It is recommended to make control openings of the hatch once every three months.
4.Closing.
Before closing, check that there are no foreign objects on the hatch frame and that the seal is correctly inserted.
4.1 release the cover by holding it by the screw door and the T-shaped handle
4.2 unscrew the screw handle from the hole
5. Instructions for the installation of fittings
When installing, attention must be paid to threaded connections. They must be securely locked. No play is allowed. With the roof open, the stem of the valve must be at the bottom (Avoid lateral loads on shock absorbers, do not expose shock absorbers especially to the stem to shock, pollution, or aggressive environment.